Search

Lindahl helps EnergieKontor secure financing for the Withernwick Extension Wind Farm

Lindahl was engaged by EnergieKontor to provide a long-term energy yield assessment of the planned Withernwick Wind Farm Extension located in East Riding of Yorkshire. The project, consisting of four 2.05MW Senvion Wind Turbines, is located adjacent to the already operating Withernwick Wind Farm.

As a first step, we undertook a long-term energy yield assessment of the existing Withernwick Wind Farm based on a comprehensive analysis of three years of 10-minute SCADA statistics recorded at the 9 wind turbines, and long-term wind speed data obtained from a reanalysis data set.


In a second step, the results for the existing wind turbines were extrapolated to the locations and hub-heights of the planned extension turbines drawing on flow performance metrics from existing pre-construction energy yield reports. A detailed net energy yield prediction report for the extension, including quantification of confidence intervals, was issued to EnergieKontor within seven days of the initial engagement.


At Lindahl we pride ourselves on delivering services tailor made to fit within our Customers challenging project requirements. On this occasion we developed and executed a scope and process designed to very quickly provide robust evidence of expected energy yields for a planned wind farm, primarily driven by robust analysis of operating data.


Lambert Kleinjans, Financing and Construction Project Manager, at EnergieKontor commented:


We are pleased to have financed the first subsidy free wind farm in the UK. Lindahl provided efficient and high quality services helping a smooth bank due diligence process to deliver this subsidy free wind project.
0 views

© Lindahl Ltd 2019